DPR Part E · Learner & institution journey
ITI Management System
The institutional backbone — one system of record for admissions, students, attendance, timetable, hostel, fees, instructors and infrastructure.
Overview
What this module does
The ITI Management System digitises the core administrative and operational functions of an Industrial Training Institute — work that today runs on manual registers, spreadsheets and disconnected State systems.
It gives every ITI a single system of record for operations, gives State Directorates and DGT real-time visibility, and feeds clean, validated data to every other LOMS module.
It is the 'core of the LOMS ERP' in one specific sense: other modules consume its student and institution master data.
Why a separate module
ITI operations are the largest manual gap in the As-Is baseline, and they provide the validated base for every other module.
System of record for
- Student master record (PRN)
- Attendance — the single source for all LOMS modules
- Timetable, hostel, fee records
- Instructor records and SPV contractual staff payroll
- Infrastructure and asset readiness
Boundaries
Scope & key assumptions
In scope
- Admission workflow — application, eligibility / seat matrix, documents, allotment, enrolment
- Student Information System — unified profile, history, batch mapping, transfers, dropouts
- Attendance — biometric / app-based capture, leave workflows
- Timetable and scheduling with clash detection
- Hostel — allotment, occupancy, mess and warden workflows
- Fee — structure, collection, receipts, dues, scholarship / DBT linkage
- Instructor management and Train-the-Trainer (ToT)
- Infrastructure readiness tracking (PM-SETU clusters first)
Key assumptions
- Seat-matrix and trade-affiliation processes exist at Centre / State and integrate via APIs.
- Aadhaar eKYC and DigiLocker available for identity and credential verification.
- Biometric / app-based attendance mandatory for the 1,000 PM-SETU ITIs (subject to DGT policy change).
- CTS admissions stay on State admission systems (12 priority States first) and are consumed through APIs.
- Government staff payroll stays with State payroll — ITI Management only passes attendance and leave inputs.
| As-Is gap | How this module responds |
|---|---|
| Admissions on State-specific systems, limited eligibility validation | Online application, automated eligibility, DigiLocker document verification. |
| No dedicated SIS for ITIs | Unified student profile from admission to certification — single source of truth. |
| Attendance largely in manual registers | Biometric / app capture with real-time roll-up to State and DGT. |
| No timetable system | Automated scheduling integrated with instructor management. |
| Cash / manual fee receipts | Digital collection with real-time reconciliation and DBT linkage. |
| Infrastructure via periodic manual reports | Readiness tracker with geo-tagged evidence and alerts. |
7 roles
Stakeholders & roles
ITI Principal
Single dashboard of admissions, attendance, staff and infrastructure; approvals.
Admission staff
Application intake, seat allotment and enrolment workflow.
Trainer
Attendance marking, batch timetable and student list.
Student / Trainee
Application status, enrolment confirmation, fee dues, attendance.
Hostel warden
Room allotment, occupancy and mess management.
State Directorate
ITI-wise monitoring of admissions, attendance and infrastructure readiness.
DGT / PM-SETU team
National roll-up with exception and risk flags.
8 pillars
Functional pillars
- Public online application portal (web & mobile)
- OTP self-registration and Aadhaar eKYC
- Seat-matrix eligibility check and merit list
- Counselling and seat allotment
- Document verification and enrolment; DGT generates PRN
Persona by persona
User journeys
- 1
Discover
Browse trades and ITIs, eligibility, fee and duration.
- 2
Apply
Register, fill details, upload documents, pay application fee.
- 3
Eligibility & merit
System validates eligibility; DGT publishes merit list.
- 4
Counselling
Lock trade preference; receive allotment letter.
- 5
Verification
Submit documents to ITI; ITI admin verifies.
- 6
Enrolment
Institute approves; DGT generates Permanent Registration Number (PRN).
How work moves
Process flow
Admission to enrolment
= control / decision point- 1DGTOpen admission cycle & publish training calendar
- 2State portal adminConfigure trade-wise seat matrix with reservation
- 3StudentApply online with documents & eKYC
- 4SystemAutomated eligibility vs seat matrix
- 5DGTMerit list & counselling → seat allotment
- 6ITI adminDocument verification & enrolment approval
- 7DGTGenerate PRN → student record created in SIS
Fee collection
= control / decision point- 1State / UTGenerate fee demand per approved structure
- 2StudentReceive notice & remit payment
- 3Fee sectionReconcile payment against demand
- 4SystemUpdate ledger & issue receipt — or reminder → defaulter flag
APIs and events only
Integrations & data exchange
Receives from
State admission portals
CTS admission & enrolment records
Aadhaar eKYC / DigiLocker
Identity and document verification
SIDH
Student and examination data
Sends to
LMS
Student master, batches, attendance
Exam Management
Attendance & internal assessment for eligibility
FMS
Fee collection feed; SPV staff payroll
Industry Management
Basic alumni references
Monitoring / Analytics
Trainer vacancy, readiness, operational KPIs
Numbers that matter
Key rules & non-functional requirements
Business rules
- Attendance
- ITI Management is the single source of attendance for LOMS
- Attendance capture
- Biometric / app mandatory for PM-SETU ITIs; manual fallback early only
- CTS admissions
- Stay on State systems; consumed via API
- Non-CTS (SPV) courses
- Admitted in ITI Management
- Payroll
- SPV contractual staff here; Government staff on State payroll
Performance, capacity & security
- Concurrent sessions
- 10,000 normal · 30,000 in admission window
- Throughput
- 200 TPS rising to 600 TPS at peak
- Infra (app tier)
- 64 vCPU · 256 GB · 10 TB objects
- Data
- Encrypted storage of learner documents
Platform-wide: page load ≤ 3 s (p90), API ≤ 500 ms (p95), ≥ 99.5% availability, RTO 4 h / RPO 30 min. See architecture.
Implementation
Phased rollout
First
- — PM-SETU cluster ITIs onboarded
- — 12 priority States for admission API integration
Then
- — Extension to the wider ITI ecosystem without redesign
- — Phased digitisation of legacy paper records