DPR Part G · Learner & institution journey
Exam Management System
No parallel exam portal — PM-SETU becomes scheme-aware inside the existing SIDH examination ecosystem.
Overview
What this module does
The Craftsmen Training Scheme (CTS) examination is the formal assessment and certification stage that follows State-led admission and ITI training.
This module does not propose a separate examination portal. PM-SETU integrates with the existing Skill India Digital Hub (SIDH) examination flows for registration, eligibility, centre / shift, practical marks, result publication and digital certification.
PM-SETU adds only the scheme-specific configuration, identifiers, data contracts and downstream data exchange needed to make these flows visible and measurable — without creating a second source of truth.
Why a separate module
SIDH stays authoritative, so LOMS adds only scheme context and integration and creates no parallel examination system.
System of record for
- PM-SETU participation mapping
- Validated examination events published to LOMS
Boundaries
Scope & key assumptions
In scope
- Identification of the PM-SETU candidate cohort on SIDH
- Main and Supplementary exam cycles
- Eligibility using attendance and Formative Assessment (FA)
- Question bank & paper generation hand-offs (NIMI → agency)
- Centre / shift / CBT and practical examination workflows
- Project work / OJT component marks
- Results, grace marks, QR-enabled digital certification
Key assumptions
- The SIDH learner / candidate ID is the primary person-level key — no new exam identity.
- SIDH carries a dedicated PM-SETU identifier / scheme tag linked to ITI, cluster, trade, batch and cycle.
- Eligibility thresholds (currently discussed ≥ 80% attendance, ≥ 60% FA) are configurable without code change.
- DGT defines the schedule and result rules; States appoint practical examiners; NIMI owns the question bank.
- Formative and practical assessments are run by the SPV; the CBT by DGT. CITS exams are out of scope (Phase 2).
8 roles
Stakeholders & roles
Candidate / trainee
Uses the existing SIDH journey; receives centre / shift, result, marksheet, certificate.
ITI / institution
Provides attendance / FA evidence and practical readiness.
Practical examiner / Nodal authority
Conducts practical evaluation, enters and approves marks.
State Directorate
Reviews CBT centre mapping, appoints examiners, oversees practicals.
DGT examination function
Defines cycle, schedule and result rules; enables PM-SETU cohort filtering.
NIMI
Develops, vets and translates the theory question bank.
CBT examination agency
Generates papers, proposes centres / shifts, conducts CBT, returns marks.
SIDH
Authoritative platform for registration, result, marksheet and certification.
9 pillars
Functional pillars
- Main and Supplementary cycles
- PM-SETU cohort applicability
- Fee windows and candidate-freeze milestones
- Theory, practical and result schedules
Persona by persona
User journeys
- 1
Identity
Uses the SIDH identity created after State admission, Aadhaar eKYC and APAAR.
- 2
Eligibility
Attendance and FA checks under the configured rule.
- 3
Allocation
Main / Supplementary cycle, centre, shift and schedule via SIDH.
- 4
Examination
CBT, practical and other components through SIDH / State / agency.
- 5
Outcome
Result, digitally signed marksheet and QR certificate on SIDH.
How work moves
Process flow
End-to-end CTS examination (PM-SETU cohort)
= control / decision point- 1DGTConfigure Main / Supplementary cycle
- 2ITIUpload attendance & internal assessment to SIDH
- 3SIDHApply eligibility rule (attendance / FA)
- 4NIMI → AgencyQuestion bank hand-off & paper generation
- 5Agency → StateCentre / shift proposal & approval
- 6Agency / ExaminerCBT and practical exams; marks returned
- 7SIDHResult with grace rules → marksheet & QR certificate
- 8Integration layerValidated events to LMS, Monitoring, Analytics
APIs and events only
Integrations & data exchange
Receives from
ITI Management
Attendance and internal assessment
LMS
Formative assessment, project / OJT component references
Digital TLM / NIMI
Approved question bank references
Sends to
LMS
Exam, result and credential references
Monitoring
CTS pass %, certification evidence
Analytics
Appearance, result, pass-rate, certification
Numbers that matter
Key rules & non-functional requirements
Business rules
- Person key
- Existing SIDH learner / candidate ID
- Eligibility (under discussion)
- ≥ 80% attendance, ≥ 60% FA — configurable
- Cycles
- Main and Supplementary per year
- Assessment split
- SPV: formative & practical · DGT: CBT
- Out of scope
- CITS examinations (Phase 2); State admission
Performance, capacity & security
- Sizing basis
- Event windows: registration, allotment, marks upload, results
- Bulk exchange
- Restartable high-volume processing with reconciliation counts
- Restricted content
- HSM-backed vault; no partial publication of results
- Infra (app tier)
- 24 vCPU · 96 GB · 6 TB objects
Platform-wide: page load ≤ 3 s (p90), API ≤ 500 ms (p95), ≥ 99.5% availability, RTO 4 h / RPO 30 min. See architecture.
Implementation
Phased rollout
Initial
- — PM-SETU scheme tag on SIDH
- — Cohort filtering and event publication
- — CTS examinations only
Phase 2
- — CITS examinations revisited