All modules

DPR Part G · Learner & institution journey

Exam Management System

No parallel exam portal — PM-SETU becomes scheme-aware inside the existing SIDH examination ecosystem.

Appears in the main flow at:7. Examination & certification

Overview

What this module does

The Craftsmen Training Scheme (CTS) examination is the formal assessment and certification stage that follows State-led admission and ITI training.

This module does not propose a separate examination portal. PM-SETU integrates with the existing Skill India Digital Hub (SIDH) examination flows for registration, eligibility, centre / shift, practical marks, result publication and digital certification.

PM-SETU adds only the scheme-specific configuration, identifiers, data contracts and downstream data exchange needed to make these flows visible and measurable — without creating a second source of truth.

Why a separate module

SIDH stays authoritative, so LOMS adds only scheme context and integration and creates no parallel examination system.

System of record for

  • PM-SETU participation mapping
  • Validated examination events published to LOMS

Boundaries

Scope & key assumptions

In scope

  • Identification of the PM-SETU candidate cohort on SIDH
  • Main and Supplementary exam cycles
  • Eligibility using attendance and Formative Assessment (FA)
  • Question bank & paper generation hand-offs (NIMI → agency)
  • Centre / shift / CBT and practical examination workflows
  • Project work / OJT component marks
  • Results, grace marks, QR-enabled digital certification

Key assumptions

  • The SIDH learner / candidate ID is the primary person-level key — no new exam identity.
  • SIDH carries a dedicated PM-SETU identifier / scheme tag linked to ITI, cluster, trade, batch and cycle.
  • Eligibility thresholds (currently discussed ≥ 80% attendance, ≥ 60% FA) are configurable without code change.
  • DGT defines the schedule and result rules; States appoint practical examiners; NIMI owns the question bank.
  • Formative and practical assessments are run by the SPV; the CBT by DGT. CITS exams are out of scope (Phase 2).

8 roles

Stakeholders & roles

Candidate / trainee

Uses the existing SIDH journey; receives centre / shift, result, marksheet, certificate.

ITI / institution

Provides attendance / FA evidence and practical readiness.

Practical examiner / Nodal authority

Conducts practical evaluation, enters and approves marks.

State Directorate

Reviews CBT centre mapping, appoints examiners, oversees practicals.

DGT examination function

Defines cycle, schedule and result rules; enables PM-SETU cohort filtering.

NIMI

Develops, vets and translates the theory question bank.

CBT examination agency

Generates papers, proposes centres / shifts, conducts CBT, returns marks.

SIDH

Authoritative platform for registration, result, marksheet and certification.

9 pillars

Functional pillars

  • Main and Supplementary cycles
  • PM-SETU cohort applicability
  • Fee windows and candidate-freeze milestones
  • Theory, practical and result schedules

Persona by persona

User journeys

  1. 1

    Identity

    Uses the SIDH identity created after State admission, Aadhaar eKYC and APAAR.

  2. 2

    Eligibility

    Attendance and FA checks under the configured rule.

  3. 3

    Allocation

    Main / Supplementary cycle, centre, shift and schedule via SIDH.

  4. 4

    Examination

    CBT, practical and other components through SIDH / State / agency.

  5. 5

    Outcome

    Result, digitally signed marksheet and QR certificate on SIDH.

How work moves

Process flow

End-to-end CTS examination (PM-SETU cohort)

= control / decision point
  1. 1
    DGTConfigure Main / Supplementary cycle
  2. 2
    ITIUpload attendance & internal assessment to SIDH
  3. 3
    SIDHApply eligibility rule (attendance / FA)
  4. 4
    NIMI → AgencyQuestion bank hand-off & paper generation
  5. 5
    Agency → StateCentre / shift proposal & approval
  6. 6
    Agency / ExaminerCBT and practical exams; marks returned
  7. 7
    SIDHResult with grace rules → marksheet & QR certificate
  8. 8
    Integration layerValidated events to LMS, Monitoring, Analytics

APIs and events only

Integrations & data exchange

Receives from

ITI Management

Attendance and internal assessment

LMS

Formative assessment, project / OJT component references

Digital TLM / NIMI

Approved question bank references

Exam Management

Sends to

LMS

Exam, result and credential references

Monitoring

CTS pass %, certification evidence

Analytics

Appearance, result, pass-rate, certification

Numbers that matter

Key rules & non-functional requirements

Business rules

Person key
Existing SIDH learner / candidate ID
Eligibility (under discussion)
≥ 80% attendance, ≥ 60% FA — configurable
Cycles
Main and Supplementary per year
Assessment split
SPV: formative & practical · DGT: CBT
Out of scope
CITS examinations (Phase 2); State admission

Performance, capacity & security

Sizing basis
Event windows: registration, allotment, marks upload, results
Bulk exchange
Restartable high-volume processing with reconciliation counts
Restricted content
HSM-backed vault; no partial publication of results
Infra (app tier)
24 vCPU · 96 GB · 6 TB objects

Platform-wide: page load ≤ 3 s (p90), API ≤ 500 ms (p95), ≥ 99.5% availability, RTO 4 h / RPO 30 min. See architecture.

Implementation

Phased rollout

1

Initial

  • — PM-SETU scheme tag on SIDH
  • — Cohort filtering and event publication
  • — CTS examinations only
2

Phase 2

  • — CITS examinations revisited